This paper focuses on a time-based replenishment and dispatching policy for Stock Replenishment and Shipment Scheduling(SRSS) with stochastic and controllable lead time.Shortage is allowed but not backlogged.Utilizing the renewal theory,the extended analytical model is proposed through cost analysis.Besides,a simulating program is developed to track the long-run implementing effect of the optimal policy so as to validate the proposed model.