管理科学:面对复杂性Ⅲ—经济时序动力系统最佳时序采样间隔分析研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Management science to face with complicated problemsⅢ— study on some problems about fractral and chaotic of the economic dynamical time series
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    给出一种根据经济时序动力系统实测数据采样时间间隔 τ的最佳范围选出方法 ,并给出了相应的计算程序 ,其对低维时序动力系统和高维时序动力系统同样有效 ,算例表明本文建议的方法是有效的

    Abstract:

    The paper presents the quality is constrained by the delay time τ. We derive an upper bound for this maximum delay time. Numerical calculating results on several model chaotic time series support the theoretical argument. According to the theory the concrete paradigram, as well as the selected method of calculating length of the economic time series were proposed. The proposed method in this paper was proved by calculating examples to be effective.

    参考文献
    相似文献
    引证文献
引用本文

盛昭瀚; 马军海;.管理科学:面对复杂性Ⅲ—经济时序动力系统最佳时序采样间隔分析研究[J].管理科学学报,2000,3(1):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
您是第位访问者
管理科学学报 ® 2024 版权所有
通讯地址:天津市南开区卫津路92号天津大学第25教学楼A座908室 邮编:300072
联系电话/传真:022-27403197 电子信箱:jmsc@tju.edu.cn