    摘要:

    基于实际项目管理中,承包商和业主的利益与行为相互交织的基本事实,研究合同双方交互作用下的项目调度优化问题。首先对所研究问题进行界定,其中,业主通过支付安排对承包商施加影响以取得一个理想的项目收益,而承包商则通过调整活动进度对业主的安排产生反作用,并借此追求自身项目收益的最大化。在此基础上,以项目净现值最大化为目标,构建了由业主和承包商两个子模型构成的项目调度优化模型。鉴于问题的强NP-hard属性,设计专门的禁忌搜索启发式算法,并在随机生成的标准算例集合上对算法进行测试,结果表明该算法是求解问题的有效算法。最后,用算例对研究进行说明,得到如下结论:随着项目截止日期的延后或承包商收益底线的提高,业主的收益呈下降趋势而承包商的收益呈上升趋势。

    Abstract:

    Based on the fact that,in the actual project management,actions of the contractor and the client are interacted with each other and their profits are related closely,this paper investigates the project scheduling problem considering the interaction between the two parties of a contract. The authors identify the studied problem firstly,where the client exerts an effect on the contractor through the payment arrangement so as to obtain a desirable profit,while the contractor reacts to the client by adjusting activity schedule with the objective of maximizing his own profit.Then,taking the maximization of the project’s net present value as the objective,the authors construct a project scheduling optimization model which is composed of two submodels, namely,the contractor and the client submodel.For the strong NP-hardness of the problem,a special tabu search heuristic algorithm is developed. The algorithm is tested on a standard instance set generated randomly and the results show that the algorithm is an efficient algorithm for the problem.Ultimately,an example is utilized to illustrate the research and the following conclusions are drawn: With the postponement of the project deadline or the augment of the contractor’s profit baseline,the profit of the client tends to decrease while that of the contractor tends to increase.

    参考文献
    相似文献
    引证文献
引用本文

何正文,刘人境,胡信布.基于合同双方交互作用的项目调度优化[J].管理科学学报,2014,17(8):1~12

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2018-04-17
  • 出版日期:
您是第位访问者
管理科学学报 ® 2024 版权所有
通讯地址:天津市南开区卫津路92号天津大学第25教学楼A座908室 邮编:300072
联系电话/传真:022-27403197 电子信箱:jmsc@tju.edu.cn